Case Study
The Challenge:
A pollution control machinery builder needed a water reservoir built entirely from Type I P.V.C. as part of a larger water testing and treatment system.
The APS Solution:
We built the entire structure using Type I P.V.C. pipe, sheet and standard INPT couplings. Prior to shipment we leak tested the reservoir to confirm it was completely fluid tight.
The Result:
Built right, on time, and under budget. This system went to Mexico and is still in use after many years.